- Acreage150 Acres
- PriceContact for Pricing
Site Overview
Overview
Parcel A is the premier shovel-ready site within the Greenport International Technology Center. Designed specifically for advanced manufacturing, semiconductor fabrication, or high-density AI infrastructure, this parcel offers immediate access to critical utilities without the delays of traditional municipal permitting.
Key Advantages
- No Public Hearings Required: Pre-approved zoning under the Greenport master agreement.
- Zero Municipal Inspections: Bastrop County’s streamlined permitting process means you can break ground in under 90 days.
- EMP-Protected Microgrid Access: Unprecedented power reliability for mission-critical operations.
- Direct Highway Access: Immediate frontage on FM 969, providing a straight shot to Austin-Bergstrom International Airport (ABIA) and Tesla Giga Texas.
For full utility schematics and Chapter 312/313 abatement eligibility, please contact the Bastrop Economic Development team.
Site Specifications
Zoning Heavy Commercial / Industrial
Water Capacity 5 MGD (Expandable)
Power Capacity 100 MW (Bluebonnet Electric)
Fiber Access Available