Cedar Creek Data Center Corridor

All confirmed, planned, and land-stage data center and technology projects in the Cedar Creek area of Bastrop County.

~4,400+
Total Acreage
4
Projects
$7.2B+
Combined Investment
806+ MW
Power Capacity
Status Key: Under Construction Planning Land Only
Under Construction

EdgeConneX Data Center Campus

Developer: EdgeConneX

View Project

The anchor hyperscale data center campus on FM 535. Phase 1 broke ground and is actively under construction. CoreWeave is the named Building 1 tenant.

Acreage
166 acres
Investment
$5B+ (Phase 1: $1.4B)
Power
Up to 96 MW (grid-connected)
Tax Status
Chapter 312 abatement
Under Construction

CoreWeave (Building 1 Tenant)

Developer: CoreWeave

View Project

Specialized GPU cloud computing provider. Named Building 1 occupant in county and state records. Provides AI training and inference infrastructure.

Acreage
(within EdgeConneX)
Investment
TBD (tenant)
Power
GPU cloud compute
Tax Status
(covered by EdgeConneX)
Planning

Pacifico Energy / BlackChamber Data Center

Developer: Pacifico Energy & BlackChamber Partners

View Project

Self-powered data center campus with on-site 710 MW gas plant. Anthropic reportedly in talks to lease. All tax abatement applications withdrawn. Estimated $20M/year in full property taxes.

Acreage
2,842 acres (~600 developed)
Investment
$2.2B
Power
710 MW on-site natural gas (grid-independent)
Tax Status
Full taxes, no abatement (312 withdrawn Aug 2026)
Land Only

Amazon Data Services

Developer: Amazon / AWS

View Project

Amazon subsidiary acquired approximately 1,229 acres in May 2026. No final development decision has been announced. No construction permits or site plans filed.

Acreage
~1,229 acres
Investment
TBD
Power
TBD
Tax Status
No abatement applications filed

Why Cedar Creek

The Cedar Creek area of Bastrop County has emerged as one of the most concentrated data center corridors in Texas. The combination of available land, proximity to ERCOT grid infrastructure, Bluebonnet Electric cooperative service, and access via SH 71, FM 535, and FM 20 has attracted hyperscale developers, GPU cloud providers, and self-powered campus operators.

If all four projects proceed to full buildout, the Cedar Creek corridor would represent approximately 4,400+ acres of technology and data center land. The combined investment pipeline exceeds $7 billion. Power capacity across the corridor would exceed 800 megawatts, with the Pacifico/BlackChamber campus supplying its own 710 MW through an on-site natural gas plant.

The tax implications vary by project. EdgeConneX operates under a Chapter 312 property tax abatement. Pacifico/BlackChamber withdrew all abatement applications in August 2026 and will pay full property taxes estimated at $20 million per year. Amazon Data Services has not filed any abatement applications. CoreWeave's tax contribution flows through the EdgeConneX campus structure.

Confirmed

EdgeConneX campus actively under construction. CoreWeave is the named tenant for Building 1. These are not speculative.

Planning

Pacifico/BlackChamber has active air permits under TCEQ review and county development applications in process. Construction could begin late 2026.

Land Only

Amazon acquired ~1,229 acres in May 2026. No development decision, construction permits, or site plans have been filed.

About This Page

Building Bastrop County is an independent, public-interest information hub. This site is not a government agency and does not accept advertising. The information on this page is curated from public records, official company announcements, government filings, and verified news sources. If you believe any information is inaccurate, contact us for a correction. Status labels reflect the best available public information as of September 2026.